Alison is given four months to design the top floors of a city condo, but things get complicated when the city code requires a second exit. As a result, the project threatens to spiral out of control with heavy delays and a huge increase to the budget.
Hosted by | Submitted by | |
---|---|---|
VidSrc | WatchSeries | 7 months |
voe | xjock4ever | |
voe | xjock4ever | |
voe | xjock4ever | |
voe | Laura_K | |
voe | Laura_K | |
doodstream | Laura_K | |
doodstream | Laura_K | |
doodstream | SirLinkAlot | |
dood | songblue88 | |
dood | songblue88 | |
voe | songblue88 | |
voe | songblue88 | |
dood | aaric.shreyan |